
They finished putting in the septic system today. Or so they thought. The gravel was too large and the inspector wants them to pull it all off, and put smaller gravel down instead. Worried about silt infiltration. As you can read off the concrete, the 1500 gallon

Five hundred and fifty five linear feet of shallow trench (12") with 12" of capping fill. A neighbor who owns a nursery is going to deliver fill for the cost of moving it ($80 per load?). Ten loads?


0 comments:
Post a Comment