Sunday, July 19th: Tuesday night we tore ourselves away to go to youth conference at Alpine, WY. Rafting the Snake river for three days and etc. Awesome. But the framers kept going. The main floor roof is framed and sheeted. They added a second layer to the outer edge of the roof. The edge was ~10inches tall and Jake and Chris thought that the aluminum fascia would look better if it was tiered like on the architectural plans.


0 comments:
Post a Comment